Data Center Construction Equipment & Facility Solutions

From groundbreaking to ongoing operations, Fairchild Equipment delivers the construction equipment, storage solutions, training, and service support data center owners, contractors, and operators need to stay on schedule, operate safely, and maximize productivity.

All the Equipment You Need For Data Center Construction in One Place

JCB 509-42 Telescopic Handler.

Construction Equipment

Excavators
Telehandlers
Wheel Loaders
Skid Steers & More

Hyster H190-280XD lift truck.

Forklifts

High-Capacity Forklifts
Multi-Directional Forklifts
Electric Forklifts
Pallet Jacks & More

Raised JLG RT2669 rough terrain scissor lift.

Aerial Lifts

Scissor Lifts
Aerial Work Platforms
Vertical Mast Lifts
Boom Lifts & More

Advance Proterra professional cleaning rider sweeper.

Cleaning Equipment

Ride-On Floor Scrubbers
Floor Sweepers
Combination Sweeper-Scrubber Machines Industrial Vacuum Cleaners & More

Motrec MP-500 6 passenger utility vehicle with cab.

Industrial Utility Vehicles

Personnel Carriers
Burden Carriers
Industrial UTVs
Specialty Vehicles & More

JCB G125RS T4F generator for industrial and construction applications.

Generators

Trailer-Mounted Options
Tier 4 Final-Compliant Models
Portable Power Solutions
LiveLink Monitoring

Supporting Every Phase of the Data Center Lifecycle

Building a data center requires precision and reliable equipment at every stage. Managing multiple equipment vendors shouldn’t slow the project down. If you're a general contractor, electrical or mechanical partner, or facility manager, Fairchild Equipment offers data center build equipment from trusted brands, flexible rental options, operator training, and 24/7 service to keep your project moving.

From site preparation to final white-space cleaning, Fairchild Equipment provides equipment for each phase. Whether you need an excavator for data center site work or you need aerial lifts, generators or equipment storage for data center projects, we have the right solution.

 

Excavator icon.

Site Preparation

Excavate sites and move chillers, generators, and transformers safely.

forklift in warehouse.

Build

Move materials and crews safely and efficiently across large data center sites.

Pallet racking with storage boxes for data center equipment and materials.

Equipment Storage

Keep materials organized, accessible, and deployment-ready.

scissor lift.

Overhead Installation

Provide equipment for safe electrical, mechanical, and fiber installation at height.

floor scrubber icon.

Cleanroom Readiness

Help meet dust-control requirements before server rack deployment.

Performance monitoring chart for data center equipment and operations.

Track & Maintain

Support clean operations with the right equipment, training, and service.

Combilift forklift transporting a precast concrete duct bank inside a manufacturing facility.

Rental Equipment for Data Center Projects

Data center construction and expansion projects often require different equipment as work progresses from site preparation to interior installation and facility setup. Fairchild Equipment provides data center build equipment for material handling, elevated work, site preparation, and floor cleaning to support changing jobsite requirements. Depending on the work being completed, your needs may include renting a forklift for data center material handling or a scrubber for data center floor cleaning.

Daily, weekly, monthly, and long-term rental options are available to accommodate different timelines. Our rental team can help match equipment to the work being completed, including specialized equipment such multi-directional forklifts for long-load handling. Operator training is also available to help crews feel confident and prepared when equipment arrives on site.

Portable Power for Data Center Projects

Data center construction can require temporary power for equipment and work areas throughout the build. Fairchild Equipment offers generators from JCB’s Tier 4 Final RS range, giving project teams options based on electrical requirements. These models can be supplied on trailers for easier transport between work areas. With JCB LiveLink, teams can remotely access performance and diagnostic information from a PC or smartphone.

JCB G70RS

56 kW Prime Power
70 kVA
132-Gallon Fuel Tank
36-Hour Fuel Autonomy
66 dBA at 23 ft (75% load)

JCB G125RS

100 kW Prime Power
125 kVA
132-Gallon Fuel Tank
24-Hour Fuel Autonomy
66 dBA at 23 ft (75% load)

NEED EQUIPMENT FOR A DATA CENTER PROJECT?

Let us help you! Contact us today.